• East Oxford Health Centre
    East Oxford Health Centre
East Oxford Health Centre
Technical Advisor Duties
Client: 
Oxfordshire PCT
Contractor: 
Carillion
Construction Cost: 
£9m
Completion: 
2009

GBS were appointed as Technical Advisors to a number of Oxford LIFT schemes (including Manzil Way and Blackbird Leys). The Practice was Architectural TA throughout the whole process (RIBA Stages A-M) and was involved with the scheme over its 4-year gestation period.